私人情侣网站中文_精品欧美三级在线观看_亚洲图片偷拍一区_女人腿张开让男人桶爽在线观看_亚洲悠悠久久综合情_六十路垂乳熟年交尾_国产自产区第44页在线观看_国产一区亚洲自拍_aⅴ天堂网2021手机版_一级特黄特色高清网站

Welcome to the official website of TSD SOLAR
Your current location: Home > Product Center > Solar ground system
All-aluminum ground mounting solution
The aluminum profile floor support system is made of aluminum and can be mounted on concrete foundations or spiral piles. Suitable for open floors, conditions can also be installed on cement flat roofs. It is characterized by its light weight, sturdy construction and recyclable materials. The 渤sheng aluminum profile ground bracket has been pre-installed at the factory. The rail assembly can be installed directly after the bracket system is installed during installation. The installation procedure on site is small, and the installation efficiency is effectively improved.
technical parameter

Maximum wind resistance: 52m/s

Maximum snow resistance: 1.5KN/m2

Span range: 2.5-3.8m

System installation angle deviation: ± 2 °

Design standard: AS/NZS1170 ASCE 7-05 DIN1044, etc.

Performance parameter

Installation site: flat roof or level ground

Body material: AL6005-TH

Fastener material: SUS304

Applicable components: framed or frameless

Applicable arrangement: vertical or horizontal

Warranty period: 10 years

Product Features

  • Easy installation
    Well-designed brackets and components do not require on-site cutting and welding, and fewer on-site installation procedures, effectively improving installation efficiency.
  • Strong compatibility
    The adjustable bracket system can meet the installation requirements of different specifications of PV modules. At the same time, it is compatible with the different arrangement of components.
  • Safe and reliable
    The bracket system is made of high quality aluminum alloy and stainless steel to prevent corrosion and oxidation. The product can be recycled to reduce environmental pollution. The overall structure fully considers the factors of load bearing, wind resistance, snow resistance, earthquake resistance, etc., and has been calculated and tested to ensure safety and reliability.

Installation instructions

step1、Mounting aluminum bracket

Unfold the pre-assembled ground aluminum bracket, install the bracket on the cement foundation with the bolts embedded, align the brackets in the entire unit, and tighten the bolts.


1.jpg1.jpg


step2、Installation of ground track

The ground track is laid on the longitudinal beam of the aluminum bracket, the position of the track is adjusted and fixed on the aluminum bracket by the rail clamp. See Figure 4 and Figure 5.


1.jpg          1.jpg


If the length of the track is not enough, the multiple tracks are connected together by rail connectors. Figure 6

1.jpg

step3、Installation component

Tile the components on the rails, adjust the dimensions, and secure the components with side and intermediate pressure blocks. Figure 7, Figure 8


1.jpg

Case show

  聯(lián)系客服
  13779953611